When we arrived this morning, the fellows are working at installing our RV electrical and water hookup post.
Also we set up our video camera to do a lapse time video, 1 frame every 10 seconds, a full day in less than two minutes. Eventually I will be posting each day’s video.
The water line trench was dug the easy way! Bob and I talked about how many trenches we had dug ourselves, by hand.
One side wall goes up.
Another one follows.
The back wall, with a bathroom window, goes up next.
Then the front wall goes up.
Love how the roof just happens by the guys holding it in place, sort of free style, then nailing it in place.
Then the other end of the roof is placed and nailed.
More rafters are placed and secured.
The day is done with me standing in the doorway!
1 comment:
Wow!! I love being able to watch your progress!! I'm also glad to have good photos of Raul and his guys at work; we've spent all winter with them!
I can't wait to see your time-lapse video; what a great thing to have and keep.
My flowers look perky - thanks again for saving their lives this week!!
Post a Comment