The coach house pad is covered with plastic, the trenches are dug, sewer pipes are in place awaiting an inspection, and sections of the lot are being leveled.

IMG_6310 (2)

While all the work on our lot was being done, our next door neighbors were working also, assembling a new grill.  Looks to me like Roger was the only one working with Chuck and Bob watching and I am sure telling him what to do.

IMG_6301

Soon Bob did lend a helping hand.

IMG_6302

Before we knew it, Roger was done and proudly showing off his assembled grill.

IMG_6314

After lunch our sewer lines passed inspection, so then the rebar could be placed in trenches and also on the pad surface.

IMG_6316

Looks like all is set for a concrete pour tomorrow (Fri).