March 3, 2011 – Staking
IMG_7518
March 4, 2011 – Moving dirt
IMG_7523
IMG_7528
All of the above photos were taken by Dianne, our next door neighbor, and emailed to us, as we were on our way back to Retama from getting new shades installed at MCD in McKinney, Tx. Thanks Dianne and Roger for keeping us updated!
We arrive at Retama Village on Saturday afternoon, March 5th, so these and all future photos we taken by us.
IMG_6264
IMG_6265
IMG_6266
IMG_6280
IMG_6283
March 7, 2011
No activity on the lot.
March 8, 2011 – trenches and a few footers
IMG_6287
IMG_6288
March 9, 2011 – pipes for sewer and rebar
IMG_6294 (2)
IMG_6296 (2)
Arnold, the superintendent filling Bob in on the latest.
IMG_6294
By afternoon, the pipes were in the trenches and standing up waiting for an inspection.
IMG_6303
Each section of the pad is leveled out. This photo shows dust in the air, yes, these fellows were shoveling out the excess very fast. Roger and Dianne, next door are tying to ignore the dust while they entertain some friends visiting from Indiana.
IMG_6307
March 10, 2011 - each pad section was leveled off by hand, vapor barrier covers coach house elevated pad, waiting for sewer pipe inspection, approval comes with green tag and the placement of the rebar.
IMG_6304
The green tag is for the sewer line inspection, what it has to do with pest control, I do not know?
IMG_6330
IMG_6310 (2)
IMG_6310
IMG_6326
IMG_6317
This oval area is the green space on the RV pad. Also included in this space is a sewer cleanout and electric.
The photo below shows the green space where we are parked right now, two short blocks away.
IMG_6324
Bob on the throne!
IMG_6332
March 11, 2011 – ready to pour concrete and they do! Six trucks full plus a partial.
IMG_6322
IMG_6323
IMG_6327
IMG_6329
IMG_6331
IMG_6341
IMG_6342
IMG_6354
IMG_6356
IMG_6357
Officially ours – it is branded!!
IMG_6348
IMG_6358
March 14, 2011
IMG_6364
IMG_6365
IMG_6376
IMG_6385
IMG_6392
IMG_6398
IMG_6412
IMG_6419
IMG_6421
IMG_6368
March 15, 2011 Tyvek, siding, and trim.
IMG_6370
IMG_6372
IMG_6373
IMG_6379
IMG_6381
March 16, 2011 Nail holes and seams caulked, trim and siding painted.
IMG_6383
IMG_6437
IMG_6386
IMG_6385
March 17, 2011 Roof
IMG_6391
IMG_6450
IMG_6451
IMG_6394
March 18, 2011 Hurricane straps nailed in and the front box window framed on the inside.
IMG_6453
IMG_6456
IMG_6460

4 comments:

Travelwithwhippets said...

Your photos capture the progress perfectly! It's a thing of beauty already. See you next week! -- Dianne

Kathy said...

What fun, getting to see your new abode being built from the dirt up!
Not too many RV Parks have daily entertainment like that! :)
Just a couple of weeks and it will be all done! Amazing!
Kathy

Erin said...

Coming along nicely ... must be fun to watch the progress.

Happytrails said...

How exciting!! Things are shaping up nicely!! Keep us updated! :-)

Related Posts with Thumbnails